Applications Description
As we all know, it is necessary to pile on the foundation when building, so that most of the weight of the building can be transferred to a deep position below the ground through the pile, because the foundation at this position has much greater bearing capacity than the ground. The traditional pile driving method is mostly hammering method, which uses the impact energy of the pile hammer to overcome the resistance of the foundation soil to the pile and drive the pile to the predetermined depth. The piling efficiency of this method is very slow, and it is only suitable for soft or figurable soil layer, so it does not have wide applicability.
At this time, the advantages of Yichen Auger are reflected. Yichen auger is powered by hydraulic motor to drive the drill pipe to rotate, and the drilling teeth at the head of the auger break the soil to realize rapid drilling. After the drilling is completed, the reinforcement is inserted and the concrete is injected, making the pile driving process simple and efficient.
Compared with the hammering method, the spiral drilling method does not need to pre pour the foundation pile, but drill the hole first and then pour the reinforced concrete pile. Such operation can reduce the construction difficulty, save the construction cost, and reduce the noise pollution caused by construction.
At the same time, the use of Yichen Auger has greater flexibility. According to the floor area, building height, soil and other factors of the building, appropriate models of auger drive, auger drill and extension rod can be selected for operation to maximize the operation efficiency.
——Auger assisted piling of farm house foundation
Hot Tags: Auger assisted piling of farm house foundation, Manufacturers, Suppliers, China, Factory, Made in China, CE, Quality, Advanced, Buy, Price, Quotation