Home > News > Blogs

Yichen Auger and Auger Drive Applied To Foundation Piles Of High-voltage Electrical Towers

2022-03-17



In December 2021, on a hilltop in Chuanshan District, Suining City, Sichuan Province, a Yichen YA-80000 earth drill or earth auger was installed on a Komatsu 360 excavator and was drilling high-voltage tower foundation piles on site. The soil condition here is complex, and the soil contains large and small rocks. Local authorities plan to build a number of high-voltage towers here. The construction party wants to drill a circular hole pile with a diameter of about 1 meter and a depth of 7 meters on the site, which will be used as the foundation of the high-voltage electrical tower.


Due to the mountainous area, it is difficult to transport large drilling equipment up the mountain. So what kind of equipment to use for drilling has become the core issue considered by the construction party. In this regard, Yichen Environment provides an auger that can be installed on an excavator. After being used on site, the Yichen auger and auger drive can still drill round hole piles regardless of the complex soil condition. The good construction effect made the construction party very satisfied, not only solved the drilling problem, but also completed the construction work as scheduled.