Home > News > Blogs

Yichen Excavator Auger Suitable For Various Working Conditions

2022-03-17


The excavator auger produced by Yichen Company has a variety of models, which can be assembled on different types of excavators. At the same time, the company also produces auger drill, auger extension and auger teeth of different specifications, which can easily cope with various terrains and are suitable for various working conditions.


Drilling utility pole holes, photovoltaic holes

No.1 Drilling utility pole holes, photovoltaic holes
The application of excavator auger in drilling utility pole holes and photovoltaic holes is very common, and it has become the mainstream construction equipment. Drilling diameter and drilling depth can be easily controlled with an auger, and drilling efficiency is greatly improved. It is also crucial that utility poles and photovoltaic power stations are sometimes located on the top of the mountain, and the auger is mounted on the excavator, allowing easy access to the construction area.
No.2 Planting trees
The auger tree planting method, also known as dry planting, uses micro-power to drive the excavator auger to drill holes, insert saplings, and then compact the sand, which is also fast and efficient. This method belongs to "minimally invasive" tree planting, which reduces the disturbance to the surface and solves the problem of lack of water sources for tree planting in deserts. It also reduced the cost of planting trees from 15,000 yuan per hectare to 3,000 yuan, less than $500. At the same time, the survival rate of saplings has also increased from 10% to about 90%.

Planting trees

Building foundation piles

No.3 Building foundation piles
In rural areas of Yunnan, the auger drilling method is often used for the foundation piles of agricultural houses. The construction process of this method is very simple. First, an excavator auger is used to drill a hole in the ground, and then a steel cage is put into it, and then concrete is injected to finally form a pile body. The piling method is simple to operate, saves time and effort compared with the traditional piling method, and is suitable for sandy soil or old clay with relatively large soil layer plasticity.