As we all know, the auger is a kind of fast drilling equipment, which can be installed on many equipments. Some of these on the market are electrically driven and some are hydraulically driven. Compared with electric drive, hydraulic auger has higher torque, more power, and can drill more types of soil layers.
In the perception of many people, auger is usually used for drilling utility poles, drilling holes for tree planting and so on. In fact, it can be used for anything that requires drilling. Today, let me take stock of the magical uses of those auger drills!
Steel pipe dredging
Did not expect it? The auger can also be used to clear the sludge in the steel pipe pile! This is actually a type of auger horizontal application. Put the steel pipe on the ground, and use the excavator to screw the auger into the steel pipe horizontally. The sludge will adhere to the blades of the equipment, and the sludge will be brought out when it is screwed out, so as to achieve the purpose of cleaning.
Container house installation
The traditional container house installation needs to pour the cement cap first, and then install the container house on the cap. However, pouring cement is an irreversible damage to the soil. Once the project is over and the container house is removed, the cement cap will stay here forever. The application of auger can perfectly solve this problem. Usually, the screw anchor is screwed into the ground, and multiple screw anchors form multiple fulcrums, and the container house will be more stable when installed on it. When dismantling, pull out the screw anchor and use it for the installation of the container house on the next construction site. This not only does not damage the soil, but also enables reuse.
Slope protection pile foundation drilling
Slope protection is a variety of laying on the slope to prevent the slope from being eroded. Taking the laying of steel bars as an example, in order to prevent the steel bars from sliding down, drill holes at intervals on the top, and then pay attention to the cement slurry. After the pile foundation is formed, it is used to pull the steel bars on the slope protection. When the drilling depth is 3 meters and the diameter is 50 cm, the drilling speed is 2 minutes for one hole pile, and the drilling efficiency is very high.